Extended Phase 1 habitat survey of the site of a proposed housing development on a former mill and culverted watercourse. Assessment of the nature conservation value of the area and identification of features of conservation value. Production of survey report and assessment of the likely impacts of the development for submission to the Planning Authority.
Ecological assessment of the site of an existing quarry. Assessment of existing nature conservation value and production of a report regarding the impacts of continued quarrying on the site.
Survey of the site of a proposed housing development. Background data search, Phase 1 survey and report production.
Ecological survey and assessment of impact of a proposed housing development in an ecologically-sensitive river-side location. Production of an Ecological assessment report for submission with the planning application.
Extended Phase 1 habitat survey of a part of a municipal golf course and of sports pitches likely to be affected by a proposed housing development. Assessment of the nature conservation value of the areas and identification of features of conservation value. Production of survey report and assessment of the likely impacts of the development.
Survey of the site of a proposed housing development in the grounds of an existing Grade II Listed Building. Assessment of the value of the site as wildlife habitat and survey for signs of water vole activity.
Survey of the site of a proposed housing development on the site of a former hospital. Assessment of the value of the site as a wildlife corridor and comments upon the likely impacts of the development.
Desk-based study of ecological constraints present in an area of agricultural land likely to be affected by an underground gas pipeline. Collation of existing data, and consultations with a range of local environmental groups.
Ecological assessment of agricultural land and former landfill site likely to be affected by a proposed mine gas borehole. Production of an ecological survey report, assessment of possible impacts and selection of a preferred access route and borehole location.
Ecological assessment of hedges, drains and roadside verges at the site of a proposed roundabout. Assessment of existing nature conservation value and production of a report regarding the impacts of road improvement work.