Tree health survey of woodland adjacent to proposed quarry extension. Mapping of tree locations and assessing physiological health and physical condition as a baseline record before quarrying commences. Preparation of tree schedule and index of record photos.
Ecological assessment of a former sand quarry to update previous survey. Production of an updated survey report and assessment of the impacts of proposed restoration.
Ecological survey of the site of a proposed extension to an existing sand quarry. Assessment of impacts on adjacent habitats and survey of botanical interest on adjacent land.
Up-dated habitat survey of a former allotment site and smallholding likely to be affected by a proposed housing development. Assessment of current nature conservation value of the area and identification of features of conservation value. Production of updated survey report and assessment of the likely impacts of the development.
Ecological survey of the site of an extension to a sand quarry following minor amendments to the proposed extraction area. Re-assessment of impacts on adjacent habitats, and survey of botanical interest on adjacent land designated as a local Nature Conservation Site.
Water vole survey of River Idle where bank re-inforcement was proposed. Assessment of the value of the bank as potential habitat for water vole. Survey for field signs and burrows. Production of a survey report for submission to the Environment Agency.
Ecological survey and assessment of a proposed development site (former pig farm), adjacent to a Site of Importance for Nature Conservation. Production of ecological survey report and assessment of impacts for submission with planning application.
Ecological survey and assessment of a proposed development site adjacent to a Site of Importance for Nature Conservation. Production of ecological survey report and assessment of impacts for submission with planning application.
National Vegetation Classification Survey and River Corridor Survey of Oxton Dumble and Dover Beck as part of long-running monitoring programme to assess the effectiveness of flow augmentation schemes. Production of survey reports and analysis of current water level conditions and possible causes of desiccation of wet woodland habitat.
Water vole survey of the banks of un-named watercourse next to existing hotel access road. Assessment of the value of the area as habitat for water vole. Production of a survey report for submission to Environment Agency.