Preparation of translocation method statement for transfer of species-rich turf from site affected by development. Production of detailed landscaping specification and five-year aftercare management schedule and post-translocation monitoring.
Ecological survey and assessment of the biodiversity present in an active gritstone quarry within the Peak District National Park. Provision of advice on avoidance of potential negative impacts on biodiversity and suggestions for biodiversity enhancement projects to assist with an application for the Wildlife Trust’s ‘Biodiversity Benchmark’ award.
Biodiversity assessment of works to re-route Yorkshire Water sewers in connection with proposed road scheme. Identification of Ecological constraints and preparation of guidance and recommendations for the works contractors.
Ecological survey and assessment of an area of former railway sidings and adjacent land bordering the River Rother. Production of a report for submission with planning application for development of 9 hole golf course.
Biodiversity assessment of works to Yorkshire Water water treatment facilities. Identification of Ecological constraints and preparation of guidance and recommendations for the works contractors.
Pre-works survey of un-named watercourse for protected species prior to drain widening flood alleviation scheme; Hatton, Derbyshire.
Water vole survey of the banks of a small stream in proximity to proposed bank reinforcement work. Assessment of the value of the area as habitat for water vole. Production of a survey report assessing the possible impact of proposed works.
Water vole survey of the banks of a small stream in proximity to proposed bank reinforcement and culvert renewal work. Assessment of the value of the area as habitat for water vole. Production of a survey report assessing the possible impact of proposed works.
Identification of ecological constraints on, and appraisal of likely ecological impacts of, proposed flood alleviation options for un-named watercourse.
Identification of ecological constraints and preliminary appraisal of likely ecological impacts of proposed flood alleviation options for the Upper Don catchment.