Preparation of Hydroecological report into the water level requirements for wetlands, reedbeds and mire habitats at a Local Nature Reserve. Investigation of potential sources of water for re-wetting.
Botanical survey and Phase 1 Habitat Survey of part of a restored colliery site. Preparation of EcoHomes assessment report.
First year of a further three-year contract dealing with planning-related enquiries in the Humber to Pennines Team Area. Responding to consultations, providing advice on protected species and completing casework.
Continuation of contract dealing with planning-related enquiries in the Humber to Pennines Team Area. Responding to consultations, providing advice on protected species and completing casework.
Preparation of a habitat management plan for stream, pond and valley grassland habitats.
Identification of Statutory sites of nature conservation interest and European Sites in proximity to an existing quarry sites. Assessment of the vulnerability of these sites to the impacts of quarrying operations. Production of a report for inclusion within an IPPC application.
Identification of Statutory sites of nature conservation interest and European Sites in proximity to three existing waste management sites. Assessment of the vulnerability of these sites to the impacts of inert landfilling operations. Production of reports for inclusion within an IPPC application.
Identification of Statutory sites of nature conservation interest and European Sites in proximity to two existing waste management sites. Assessment of the vulnerability of these sites to the impacts of inert landfilling operations. Production of a report for inclusion within an IPPC application.
Identification of Statutory sites of nature conservation interest and European Sites in proximity to an existing waste management site. Assessment of the vulnerability of these sites to the impacts of inert landfilling operations. Production of a report for inclusion within an IPPC application.
Identification of Statutory sites of nature conservation interest in proximity to an existing brickworks sites. Assessment of the vulnerability of these sites to the impacts of brickmaking operations. Production of brief report for inclusion within an IPPC application.